CTU Simulation Training System

Simulate CTU operation and working condition based on the arrangement on site and display key component operating status (e.g. BOP, stripper, injector, X-mas tree, tubing string). Jobs can be simulated include gas lift, sand removal, well cleanout, fluid displacement, acidizing, fracturing and fishing

Description

⊙ Simulate CTU operation and working condition based on the arrangement on site and display key component operating status (e.g. BOP, stripper, injector, X-mas tree, tubing string). Jobs can be simulated include gas lift, sand removal, well cleanout, fluid displacement, acidizing, fracturing and fishing.


⊙ CTU rig up/rig down simulation includes stripper installation, BOP & injector lifting, downhole tool string installation/removal, X-mas tree main valve open/close control, tubing purging (N2), removal of pipelines connected to the injector. (More interfaces for customized operation simulation are available).



Specifications

Voltage

220V 50Hz AC

Power Rating

1,500 W

Ambient Temperature

-20℃~50℃

Resolution

Single/splicing 1920*1080, 5400*1920, 3840*1080

Average Non-failure Operation Time

≥10,000 hours

Dimensions (L×W×H)

90.55"×44.50"×52.16"

Photo Gallery

Data Download

Leave a message

captcha

Related products

Leave a message

Please feel free to contact us at any time.

captcha